Ramon L. Van Sickle
D/B/A
INDIANAPOLIS TERRY AIRPORT
11355 E. STATE ROAD 32, ZIONSVILLE, INDIANA 46077
(317) 769-3288

October 26, 2001

Micheal A. Howard
Attorney At Law
694 Logan Street
Noblesville, Indiana 46060

Re: Indianapolis Terry Airport

Dear Mr. Howard,

We have owned and operated the Indianapolis Terry Airport since 1965. The value and investment in the Terry Airport is prepared by first listing the items which could anticipate AIP Participation. This is only this documents opinion and does not represent FAA approval.

Land
Outer Marker Land
$ 15,600
Parcels 1 and 2 210 acres @ $19,800
4,158,000
Less Parcel 2A and 2B
48,000
TOTAL LAND
$ 4,125,600
Infrastructure
Existing Airport Terminal Building
$ 40,000
T-hanger One
50,000
T-hanger Two
50,000
A Frame
4,000
100 Oct. Fuel Facility
10,000
Localizer
75,000
Glide Slope
75,000
Marker Beacons
3,000
Original Runway Pavement (5,160' x 75' = 43,000 Sq. Yds. @ $4.00
172,000
Taxiway Apron Pavement Outside RPZ (3,900 Sq. Yds.)
11,600
TOTAL INFRASTRUCTURE
$ 490,600
The Following Land has been Acquired with AIP Funding
AIP 01 - Parcel 3, 40.62AC
$ 109,555
AIP 03 - Parcel 5, 20.642AC
71,148
AIP 05 - Parcel 4, 120AC
314,429
AIP 06 - Parcel 6 and 7, 132.8AC
874,570
TOTAL
$ 1,369,702
x 5%
$ 68,485
Total Anticipated to be AIP Eligible
$ 4,684,685
5% of Parcel 3 eligible for State Participation
$ 5,467
The Following Development was Constructed with AIP Funding
AIP 01 - Drainage system and detention reservoir
$ 818,217
AIP 02 - Reconstruct R/W 18-36 (5,000' x 1,000'), HIRL, REIL Rotating Beacon
1,362,123
AIP 03 - Aircraft Apron, connecting and Partial Parallel T/W, Access Road
1,085,329
AIP 04 - R/W Extension (500' x 100'), Connecting and Partial Parallel T/W T-hanger T/W PAPI
1,175,851
TOTAL
$ 4,441,520
x 5%
$ 222,076
The Following Items are Probably not AIP Eligible
Foundation and Framework for new Hanger
$ 33,000
T-hanger Three
49,000
Corporate Hanger
42,000
Temporary Line Trailer
5,000
Jet Fuel Facility
25,000
TOTAL
$ 154,000
The existing large maintenance hanger and storage hanger are not owned by the airport.
The Following was non AIP Eligible Item was Constructed with AIP Items
Auto Parking
$ 8,742
TOTAL VALUE AND INVESTMENT
$ 5,074,970

The land value was determined by appraisal of the 40 acre Parcel 2 required by FAA for owner participation value in Parcels 2A and 2B. The professional value should be obtained by acquiring an appraisel and review per AC 150/5100-17.

We have asked our Consulting Engineer, Mid-States Engineering to provide an analysis of conditions, which exist at the airport.

Yours Truly,

Ramon L. Van Sickle

cc: Mid-States Engineering
Mike Andreoli